Services
From first scan to signed contract
Each phase builds on the last, and each comes with limited subsidy available under the Flex-e scheme from the Netherlands Enterprise Agency (RVO).
STEP 1
Flexibility scan
Receive 50% subsidyIdentify how your business can use electricity smarter, without waiting for grid upgrades. A structured analysis of load profiles, peaks and flexibility potential, aligned with the RVO Flex-e scheme.
View the scan
STEP 2
Feasibility study
Receive 50% subsidyTranslate identified opportunities into concrete, investment-ready solutions. Technical feasibility, business case and impact on your grid connection, validated in depth.
View the study
STEP 3
EPC contracting
40% subsidy on the EPC priceFrom validated business case to a contracted, financed, subsidy-supported project, most commonly a battery energy storage system (BESS), realized under optimal conditions.
View EPC contracting